MultiCare Tacoma General Hospital
Vergent's 2 MW combined cycle microturbine system delivers cost savings and energy resilience for MultiCare Tacoma General Hospital.

MultiCare Tacoma General Hospital
Vergent's 2 MW combined cycle microturbine system delivers cost savings and energy resilience for MultiCare Tacoma General Hospital.
Client:
MultiCare Health System
Industry:
Healthcare
Location:
Tacoma, Washington
System Size:
Two C1000S (2MW)
Operating Mode:
Grid Connect
Controls:
MTIM
Commissioning Date:
2026
Healthcare Efficiency: MultiCare's Onsite Power Solution
MultiCare Tacoma General Hospital, a flagship 437-bed Level II adult trauma center in Tacoma, Washington, faced immense energy management pressures. As one of the most energy-intensive commercial buildings, its expansive campus – including the 250,000-square-foot Milgard Pavilion and a 200,000-square-foot emergency department addition – consumed significantly more energy due to continuous 24/7 operations and high-demand medical equipment. With utility costs often exceeding 50% of annual maintenance budgets and a growing commitment to reduce greenhouse gas (GHG) emissions amidst strained healthcare finances, the hospital needed a solution to improve efficiency, reduce costs, and advance sustainability.
Vergent implemented an advanced 2 MW combined cycle onsite generation system for MultiCare Tacoma General Hospital. This highly efficient solution utilizes two Capstone C1000S microturbines coupled with a Heat Recovery Steam Generator (HRSG) to capture and reuse waste heat. The entire system is managed by a Vergent controller, ensuring optimal performance, automation, and remote service capabilities.
This onsite generation system significantly reduces MultiCare Tacoma General Hospital’s reliance on grid power, leading to substantial utility cost savings and enhanced energy resilience crucial for continuous hospital operations. The combined cycle approach maximizes efficiency, reducing the hospital’s carbon footprint and contributing to its ambitious greenhouse gas emission reduction and net-zero targets. The automated control system ensures consistent, reliable power, freeing up budget for patient care and directly supporting the hospital’s mission to provide exceptional healthcare while advancing its sustainability goals.
Steam Production
2000 lbs/hr
Energy Savings
$200,000 per year
Yearly Output
2,500+ MWh
Modular Bays
5
Power
325 kW
Related Posts

70 Mill Street
Industrial, Manufacturing & Data Centers

Ben Franklin Middle School
Industrial, Manufacturing & Data Centers

Get in Touch
We take pride in delivering world-class energy solutions for our customers, and providing the best possible service.