Regency Plastics
Plastics manufacturer relies on 390kW distributed energy system to reduce its high energy costs.

Regency Plastics
Plastics manufacturer relies on 390kW distributed energy system to reduce its high energy costs.
Client:
Regency Plastics
Industry:
Manufacturing
Location:
Toronto, Ontario
System Size:
Six C65 (390kW)
Operating Mode:
Grid Connect
Controls:
MicroMTIM
Commissioning Date:
2019
Off-grid Generation Powering Utility Operations
Located in the heart of Toronto, this Plastics Manufacturer was looking to fix energy costs and increase electric capacity in the plant to support the addition of future lines. This site is grid connected at 390kW of onsite generation to support operations, fix energy costs to allow for stable manufacturing costs and increase electric capacity for future phases.
Moving Parts
1
Energy Savings
$100,000 per year
Yearly Output
2,000+ MWh
Modular Bays
6
Power
395 kW

Resilient Infrastructure Designed for Growth
We go beyond equipment supply to deliver integrated energy assets that secure your operational future. Let’s discuss how our end-to-end engineering and execution can empower your next expansion.