Longos Walkers Line

Innovative refrigeration microgrid powered by 130kW CHP system that also provides free heating and cooling and significant carbon savings.

Longos Walkers Line

Innovative refrigeration microgrid powered by 130kW CHP system that also provides free heating and cooling and significant carbon savings.

Customer:

Longo’s

Industry:

Food and Beverage

Location:

Burlington, Ontario

System Size:

Two C65 (130kW)

Operating Mode:

Dual Mode

Controls:

Dual Mode MTIM

Commissioning Date:

2022

CCHP and CO2 Refrigeration System Result in Significant GHG Reductions

With a commitment to high-tech, environmentally friendly practices, Longo Brothers Fruit Markets Inc. embarked on a retrofit project to implement a highly efficient, reliable power solution that would allow them to reduce energy costs and further their sustainability goals at their Burlington Walkers Line store in the Greater Toronto Area.

The project implemented a sophisticated CCHP system as the backbone of a power and thermal microgrid, configured with dual-mode controls for an automatic transition between grid-connected and standalone operation in the event of a power interruption. The system’s two C65 microturbines produce electricity while the exhaust is channeled to integrated heat recovery modules to provide hot water. The exhaust is also used by an 80-ton absorption chiller to provide on-site chilled water which complements the CO2 system to ensure its operation in sub-critical mode all throughout the year. Because different environmental temperatures create different needs, the systems adapt seasonally.

During the summer months, the CHP hot water output is used by a make-up air unit to provide dehumidification, while the absorption chiller provides chilled water to the CO2 racks to precool the system and improves refrigeration system efficiency. In the winter, however, the CHP hot water is used to provide heating for the building reducing natural gas consumption for heating, while the CO2 refrigeration racks get precooling from the cold outside air.

Hot Water

860,000 BTU/hr

Energy Savings

$130,000 per year

Yearly Output

1,100+ MWh

Chilled Water

80 tons

Power

130 kW

Related Posts

70 Mill Street

Industrial, Manufacturing & Data Centers

70 Mill Street

Industrial, Manufacturing & Data Centers

Black River Memorial Hospital

Healthcare

Black River Memorial Hospital

Healthcare

MultiCare Tacoma General Hospital

Healthcare

MultiCare Tacoma General Hospital

Healthcare

Energy storage system or battery container unit with solar panel_

Get in Touch

We take pride in delivering world-class energy solutions for our customers, and providing the best possible service.

Contact Us
star icon
bottom of page