Lebanon Landfill

This municipal facility receives baseload power and free heating from this CHP system, as well as critical backup capacity.

Lebanon Landfill

This municipal facility receives baseload power and free heating from this CHP system, as well as critical backup capacity.

Client:

City of Lebanon

Industry:

Landfill

Location:

Lebanon, New Hampshire

System Size:

C1000S (1000kW)

Operating Mode:

Grid Connect

Controls:

Grid Connect MTIM

Commissioning Date:

2023

A model for a Balanced & Sustainable Community

The Lebanon Solid Waste Facility faced several critical challenges related to methane emissions, energy independence, and operational costs. The landfill generated large amounts of methane and the city saw an opportunity to utilize this gas to reduce its environmental impact.

The City of Lebanon, New Hampshire, saw potential to decrease its reliance on external power grids, enhance energy security for municipal operations, and lower its high energy costs for residents. They also saw the potential to generate revenue by selling surplus electricity back to the grid.

This installation includes a Capstone C1000S (1MW) microturbine, one Vergent microturbine controller, a gas conditioning skid and integration with existing solar panels for the facility.

GHG Reduction

10,000 tons/year

Energy Savings

$250,000 per year

Yearly Output

5,000+ MWh

Modular Bays

5

Power

1000 kW

Related Posts

70 Mill Street

Industrial, Manufacturing & Data Centers

70 Mill Street

Industrial, Manufacturing & Data Centers

Black River Memorial Hospital

Healthcare

Black River Memorial Hospital

Healthcare

MultiCare Tacoma General Hospital

Healthcare

MultiCare Tacoma General Hospital

Healthcare

Energy storage system or battery container unit with solar panel_

Get in Touch

We take pride in delivering world-class energy solutions for our customers, and providing the best possible service.

Contact Us
star icon
bottom of page