Atwater Apartments
When ownership moved 480 units from electric to hydronic heat, two rooftop microturbines absorbed the new gas load, cut operating costs and captured a $100,000 ComEd incentive.

Atwater Apartments
When ownership moved 480 units from electric to hydronic heat, two rooftop microturbines absorbed the new gas load, cut operating costs and captured a $100,000 ComEd incentive.
Customer:
Atwater Apartments
Industry:
Residential
Location:
Chicago, Illinois
System Size:
130 kW
Application:
CHP
Controls:
BAS
Commissioning Date:
2020
A 55-Story Tower Goes Hydronic and Saves $100,000 a Year
The Challenge
Converting a high-rise from electric to hydronic heat moves the heating bill from tenants to the owner. At Atwater Apartments, residents faced winter electric bill spikes, so ownership planned a switch to central hot water heating. That shift would land a large new gas load on the landlord’s account, and any generation equipment had to fit a tight 54th-floor mechanical space without major building work.
The Solution
Veristar Energy worked with the project engineers to deliver a 130 kW CHP system with two Capstone C65 microturbines, integrated with new condensing boilers and the building automation system (BAS).
• Onsite Generation: Supplies baseload electricity for common areas, offsetting grid purchases.
• Heat Recovery: Feeds the new hydronic heating loop in winter and domestic hot water year-round, displacing 80%-efficient gas water heaters.
• No Gas Riser Needed: Integral fuel gas boosters run on standard low-pressure gas, saving $30,000 in booster equipment and avoiding a new gas riser through tenant suites.
The Results
• $100,000 Annual Savings: Offsets the cost of the hydronic conversion, plus a $100,000 ComEd incentive.
• 1,000+ MWh a Year: Generated onsite.
• 99% Availability: More than 16,000 operating hours on each microturbine through Chicago winters.
• 618 Tons CO₂e Avoided a Year: Net of the gas the turbines burn, using EPA eGRID factors for the RFC West region.
• Award-Winning Design: The project’s design engineer received a 2020 ASHRAE Technology Award for the hydronic conversion.
Connect with Veristar Energy to evaluate your site’s onsite power potential.
Hot Water
860,000 BTU/hr
Estimated Savings
$100,000 per year
Yearly Output
1,000+ MWh
ComEd Incentive
$100,000
Power
130 kW