
500 Murray Ross Parkway
Loyal Vergent REIT customer installed its fourth CHP system with backup capability.

500 Murray Ross Parkway
Loyal Vergent REIT customer installed its fourth CHP system with backup capability.
Client:
CAPREIT
Industry:
Residential
Location:
Toronto, Ontario
System Size:
Four C65 (260kW)
Operating Mode:
Dual Mode
Controls:
Dual Mode MTIM
Commissioning Date:
2020
Apartment Combines Energy-Saving CHP with Resiliency
The Capstone microturbine is an ideal fit for multi-unit residential applications in cold weather climates. This is already Vergent’s fourth Capstone CHP system to be installed in an apartment or condominium building in the Toronto area because building owners are looking for energy savings and resiliency. The Capstone product is compact and quiet, which allows for simple installation into existing urban buildings, plus the auto-transfer capability allows building owners to immediately power and heat their buildings if the grid fails.
Hot Water
1,720,000 BTU/hr
Energy Savings
$160,000 per year
Yearly Output
2,000+ MWh
Modular Bays
4
Power
260 kW

Get in Touch
We take pride in delivering world-class energy solutions for our customers, and providing the best possible service.








